Thursday 23 May 2013

Repairs at Napton.

After our night out we went through Sutton Stop lock and on toward Rugby. We called in at Rose Narrowboats to buy an oil filter,then carried on into Rugby where we stopped to buy oil from Halfords. Mooring outside rugby at bridge 66 so Marlene could dry some washing. While it was drying I did a long overdue oil change on the engine. The weather was good all day and I even managed to wear shorts and a T-shirt all day. Moving on Monday morning we climbed the three locks at Hillmorton by 9-30. Cruising down to Braunston Junction we turned right toward Napton. As usual Braunston was busy at the junction with moored boats on one side of the canal and boats moored at the service point on the other side, leaving hardly enough room to get through. We had trouble with the engine again loosing power on and off through the day,so we moored for the night just under the bridge from Napton Marina. Tuesday turned out to be a rest day,we set off at 8-30 but we lost power every time I typed to accelerate. We couldn't carry on like this so we turned just before Napton locks and went back to our over night mooring. I then walked round to Napton Marina and explained the problem to them,however they could't have a look at it till Wednesday morning. At 8-30 Wednesday morning we took the boat into the Marina as we needed a pump out by then. The problem turned out to be a dirty fuel filter which they changed and by 10-15 and we were on our way. From Napton we climbed the nine locks in the flight then a steady cruise to Fenny Compton where we moored for the night. Today we have done eight locks in sun and heavy showers to finally moor at Cropredy for the night. Tomorrow we have a short trip into Banbury where we will shop and meet Stephen and the boys.

No comments:

Post a Comment