Monday, 17 August 2009
Puffer Parts.
Leaving the locks behind we started a lock free stretch which will take us to Skipton. Although it's lock free there are quite a number of swing bridges. The first was open,then at the second the key appeared stuck in the control box. The BW emergency line was phoned,then a man living in a house over looking the bridge came and suggested that the barriers may not be fully locked back,this proved to be the case and we were on our way again, after phoning the emergency line again.The weather was sun and showers, some heavy.We moored near Puffer Parts Chancellery where we Bought some things we needed. After lunch we walked into Keithley about a half hour walk. We then went two swing bridges further on and moored for the night in a rocky and wooded area(see pictures).
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment